Wednesday, November 19.The new project will included a fully-paved lot, but its very small and only has enough room for twelve cars maximum.
Residents worry that one of those spaces will be reserved for garbage and recycling bins. They worry about noise and that garbage will pile up during construction. The sections which no longer apply are: 3.5, which determines building usage; 5.3 which specifies parking restrictions; 6.1.1 which describes necessary margins to the edge of the property, curbs, etc.; 6.1.5.3.1.1, which says that the space in rear dedicated to parking must be no more that 35; 7.12, which specifies reasons for exceptions to the bylaws; 7.55, which limits the number of units to 7; and 7.75, which includes specific heritage restrictions for the area. That date has since been set, however, and borough officials say it will be October 24. This date will be published next Thursday, October 16 th in the LaSalle Messenger and on-line on the boroughs website.). The borough did however, inform 897 families living in the zones affected by the project about the consultation by placing a bilingual letter with photos in their mailboxes. Today, I joined Sonja Susjnar to comment on the AgglomerationLand Use and Development Plan consultation now being heard by members of the similarly-named commission. There are many other compelling memorandums and comments by other Island of Montreal citizens to read as well. I only listed the first 12 of my 16 recommendations to the commission. Arial Mon To Arial Converter How To Control CookiesTo find out more, including how to control cookies, see here.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |